By 1808Delaware; ODOT District 6

1808Delaware is now providing regular weekend reports on road project work being conducted under the auspices of the Ohio Department of Transportation (ODOT) in Delaware and Franklin Counties.

Such work is, of course, weather dependent. This past week, ODOT District 6 shared announcements of current and upcoming work in the area.


U.S. Route 36/State Route 37

CONTINUING IMPACTS

  • South Galena Rd. at U.S. 36/SR 37 will close starting Monday, July 8 for 100 days for intersection improvements.
    • Detour: S. Galena Rd. to Cheshire Rd. to 3Bs and K Rd. to U.S. 36
  • U.S. 36/SR 37 at the I-71 interchange has a temporary traffic pattern in effect for reconstruction of the bridge over I-71. On Thursday, July 18, traffic will be switched onto the south half of the 36/37 bridge over 71, with the north half of the bridge closed. Eastbound traffic will remain reduced to 1 lane, and westbound traffic reduced to 2 lanes.
    • Left turns from U.S. 36/SR 37 to the I-71 on-ramps are restricted
    • Temporary U-turn lanes are in use at Wilson Road and in front of McDonald’s for U.S. 36 traffic seeking access to the I-71 on-ramps
    • U.S. 36 Westbound is reduced to two lanes
    • U.S. 36 Eastbound is reduced to one lane
    • Turning movements for traffic on the I-71 off-ramps will be maintained
  • U.S. 36/SR 37 is reduced to one lane in each direction between the railroad bridge and Sky View Lane/Glenview Commons. Eastbound traffic will be shifted north, with both directions of traffic maintained in the existing westbound lanes. This traffic pattern will remain in place through Summer 2024 as part of widening the route and reconstructing the railroad bridge over US 36/SR 37.
    • Access to driveways and property will be maintained, however left turns will be restricted for driveways as well as Bowtown Road traffic during peak travel times (7 AM – 9 AM, 4 PM – 6 PM). Left turns at SR 521 will be maintained throughout the phase.

U.S. Route 33

NEW IMPACTS

  • The Gender Rd. northbound ramp to U.S. 33 westbound will close starting 8 p.m. Friday, August 23 through 5 a.m., Monday, August 26.
    • Detour: Gender Rd. to U.S. 33 eastbound to Diley Rd. to U.S. 33 westbound.

State Route 315

NEW IMPACTS

  • The SR 315 northbound ramp to Cannon Dr. will close starting 8 p.m. Friday August 23 through 5 a.m. Monday, August 26.
    • Detour: SR 315 northbound to Lane Ave. to Olentangy River Rd. to John Herrick Dr. to Cannon Dr.

Interstate 270

NEW IMPACTS

  • The I-270 northbound ramp to I-70 westbound will close from 9 a.m. – 3 p.m. Monday, August 26.
    • Detour: I-270 northbound to U.S. 40 (Main St.) to I-270 southbound to I-70 westbound

  • The McComb Rd. bridge over I-270 will close starting Monday, August 26 for 90 days for bridge rehabilitation.
    • Detour: Home Rd. to Gantz Rd. to Breeze Hill Dr. to McZand Blvd. or reverse.

  • The Hamilton Rd. bridge over I-270 will have various daily lane restrictions starting Monday, August 26 through winter 2024. Northbound traffic will be shifted to the southbound lanes of the bridge.
  • The Hamilton Rd. northbound ramp to I-270 will close starting Monday, August 26 through winter 2024.
    • Northbound detour: Hamilton Rd. to Broad St. to I-270 
    • Southbound detour: Hamilton Rd. to Granville St. to U.S. 62 to I-270

Interstate 70

NEW IMPACTS

  • The Sullivant Ave. ramp to I-70 eastbound will close overnight (7 p.m. – 5 a.m.) Friday, August 23 and Sunday, August 25.
    • Detour: Sullivant Ave. to U.S. 62 to U.S. 40 to I-70.

CONTUINING IMPACTS

  • Courtright Rd. over I-70 will close starting 7 a.m. Monday, July 8 for 90 days for bridge work.
    • Detour: Groves Rd. to Hamilton Rd. to Livingston Ave. to Courtright Rd. or reverse.

Super Load

NEW IMPACTS

A Super Load is expected to impact various roadways in Franklin County. To sign up for route information and updates, visit transportation.ohio.gov/superload.


Interstates 70/71 Reconstruction

I-70/71 will experience lane restrictions through downtown Columbus to widen and reconstruct the roadway, replace bridges over the interstate, rebuild ramps, and construct new urban avenues parallel to the interstate. Various downtown ramps will permanently close. Estimated completion: Fall 2025

For more information about the Downtown Ramp Up project please visit ohgo.com/7071.


CONTINUING IMPACTS

  • The SR 315 southbound ramp to I-70 eastbound closed for multiple years Sunday, May 19, 2024, for reconstruction of I-70 eastbound.
    • Detour: I-670 eastbound to I-71 southbound to I-70 eastbound
  • The I-70 eastbound exit ramp to Front St. closed permanently June 17, 2022 so crews can construct a new exit ramp. The detour is I-70 east to Livingston Ave. to N. 4th St. to W. Mound St. to High St. or Front St. To access the Franklin County Court House parking garage on Front St., drivers should follow the detour to southbound High St. and continue to Sycamore St. to northbound Front St.
  • W. Fulton St. closed permanently June 17, 2022 between Short St. and Ludlow St.
  • Livingston Ave. closed to through traffic at City Park Ave. on June 17, 2022 until Fall 2024. Traffic coming from the exit ramp will not be impacted.
  • Beginning October 7th, 2022 Front St. converted to two-way traffic between W. Mound St. and W. Fulton St. 
  • The Front St. bridge over I-70 closed Saturday, October 29, 2022 for bridge replacement until Spring 2025.
    • Detour: W. Sycamore St. to High St. to Mound St. OR Main St. to High St. to W. Sycamore St.
  • Mound St. between 2nd St. and Civic Center Dr. closed Wednesday, September 27, 2023 through Fall 2024. Access to I-70 westbound will be maintained.
    • Detour: High St. to Sycamore St. to Short St. to Mound St.
  • Souder Ave. between Harmon Ave. and Thomas Ave. closed Monday, May 20 for one year for bridge reconstruction.
    • Detour: Mound St. to Glenwood Ave. to Sullivant Ave. to Souder Ave. or reverse.
      • Detour: Sycamore St. to High St. to Main St. to Civic Center Dr. to Mound St. to Short St. 
  • Civic Center Dr. at Mound St. is closed until Fall 2024 for reconstruction.
    • Detour: Front St. to Main St. to Civic Center Dr.
  • Short St. at Mound St. will be reduced to one lane starting Monday, July 29 through September 2024 for reconstruction. Access will be maintained via flaggers/temporary traffic signal.

1808AM
Sign up here for 1808AM, our incredible weekday morning enewsletter, bringing you the latest Delaware County news -- for free!
You May Also Like

Welcome, Hickory Woods Park

By 1808Delaware The newest in the collection of Preservation Parks will be…

Disaster Area Loans Available To Delaware County Farmers

Agriculture Secretary Sonny Perdue recently designated seven Ohio counties as primary natural…

Delaware County Communities Schedule Trick Or Treat

By 1808Delaware The Mid-Ohio Regional Planning Commission, Central Ohio Mayors & Managers…

Delaware County Ranks Among Healthiest Counties In America…Again

Delaware County shines at number ten in a list highlighting the healthiest places to live in the US.